About the project
A new 6th form extension to the existing facility in Birmingham due to be completed in 2022.
The new block will utilise high efficiency Air Source Heat Pump technology to serve underfloor heating through the building. The ASHP plant also generates the domestic hot water requirements.
Ventilation to the general classrooms is to utilise NVHR units (Natural Ventilation with Heat Recovery). VRV cooling is to be afforded to IT rich classrooms working in conjunction with MVHR (Mechanical Ventilation with Heat Recovery).
Through-out the scheme LED lighting is to be utilised along with PIR and automatic dimming.
Photovoltaic panels are provided across the roof which together with the above provides an extremely low energy and low carbon building.
Location
Enfield, London
Developer
IM Properties
Client
Speculative
Architect
UMC Architects
Project Managers
RLB
Engineers
Burrows Graham
BREEAM
D.W Pointer/Method Consulting


Get in touch with us
Call us, and our experts will answer all your questions.